Regent Preparatory School Baseball Field

Footprint
120,000 SF
Surface
AstroTurf HR
Sport(s)
Baseball
i

Owner Regent Preparatory School of Oklahoma

Construction Manager United Turf and Track

Location Tulsa, OK

Additional Details

  • New construction
  • 120,000 SF Synthetic Turf Baseball Field
  • Concrete curbing work
  • Geo-Grid Stabilization Work
  • Field Drainage System
  • 6” Multi-Layer Aggregate Dynamic Base
  • Laser Grading
  • AstroTurf HR

United Turf and Track