Additional Details
Certified Field Builder: United Turf and Track
- Removal of 6 inches of organics
- Demolition of the existing native-soil field, drainage, and earthwork
- Approximately 6 inches of imported sand for the new rootzone
- New drainage system with a main collector pipe and herringbone pattern
- Laser grading
- Surface preparation for 72,000 SF of Northbridge 31 Bermudagrass sod, 1 inch thick