University of Oklahoma Softball Love’s Field

Footprint
25,000 SF
Surface
Tahoma Bermudagrass
Sport(s)
Softball
i

Owner University of Oklahoma

Architect Populous

Construction Manager Timberlake

Location Norman, OK

Additional Details

  • New construction
  • 25,000 Sand-based field softball field
  • Irrigation System
  • 10” sand base Rootzone
  • 15,000 SF Synthetic Turf Field
  • 6” Multi-Layer Aggregate Dynamic Base
  • AstroTurf Field Diamond RBI system
  • BrockFill and BrockPad SP20XL
  • 8,000 DuraEdge Pro infield mix
  • DuraPitch mound and plate clay
  • DuraTrax warning track
  • Concrete curbing work
  • Geo-Grid Stabilization Work
  • Field Drainage System
  • Laser Grading
  • 10,000 SF Indoor Astro Turf RBI with BrockPad

United Turf and Track